Comprehensive Building Analytics

Case Study: Global Pharmaceutical Manufacturer saves $650, 000 in annual energy costs while improving comfort, sustainability and capital asset reliability.

Download the full Case Study

Cimetrics was selected to provide its Analytika Pro solution for five buildings at GPM’s campus in the Northeastern United States. The buildings included 1.5 million square feet of FDA validated and non-validated space that is utilized for offices, research laboratories, manufacturing and energy utility generation. Cimetrics collaborated with GPM and their building automation system provider to connect to and collect sensor and actuator data from over 4,700 physical points. Data was collected every 15 minutes, 24 hours a day, 365 days a year, for a total of approximately 1.5 million data samples per day from the following systems: 8 Chillers, 9 Boilers, 5 Cooling Towers, 25 Air Handling Units, 60 Laboratory Fume Hoods, 206 zones, 20 pumps and motors, and other miscellaneous equipment.

Leave a Reply

Your email address will not be published.

Share This

Copy Link to Clipboard

Copy